Reviews

Post-Op Reviews

After-action reports and post-operation reviews across all operations

OPERATION COBALT

AAR — Bond Street Shopping Detail

APPROVED
Principal:Mrs. A. Marchetti
Lead:J. Harrington
27 Mar 2026
Rating
4/5
Key Lessons
  • Intelligence feed from route team performed well — the 20-minute advance warning on the protest allowed for a clean diversion with no time pressure.
  • Retail security at two establishments were uncooperative with advance requests for staff access; recommend formal letters from client office for future engagements.
AAR
OPERATION TOPAZ

POST-OP — Claridge's VIP Dinner

APPROVED
Principal:Mr. D. Ashworth
Lead:J. Harrington
24 Mar 2026
Rating
5/5
Key Lessons
  • Formalise the multi-team pre-operation briefing format used in this operation — it worked well and should become standard practice.
  • Conduct a dedicated radio frequency survey of the Mayfair hotel district prior to future engagements — the interference issue was avoidable.
POST-OP

Lessons Learned Registry

Aggregated lessons from all post-op reviews and AARs — sortable by category

PlanningOPERATION COBALT27 Mar 2026

Retail security at certain Bond Street establishments did not cooperate with advance requests. Formal letters of introduction from client office are required for future engagements at these locations.

RPT-2026-0324
VehicleOPERATION COBALT27 Mar 2026

Parking availability on Bruton Street was limited. Alternative holding positions should be pre-surveyed for all Mayfair details.

RPT-2026-0324
CommsOPERATION TOPAZ24 Mar 2026

Radio interference on Channel 3 experienced at Claridge's due to adjacent function room. Pre-operation frequency survey required for hotel district operations. Switchover to backup channel was 4 minutes — target is under 60 seconds.

RPT-2026-0321
PlanningOPERATION TOPAZ24 Mar 2026

Multi-team pre-operation briefing format at Claridge's was highly effective. Should be formalised as standard procedure for operations involving visiting security details.

RPT-2026-0321
Threat ResponseOPERATION COBALT26 Mar 2026

Surveillance vehicle broke off cleanly after SDR, suggesting a degree of professional competence. All Operation Cobalt routes should be treated as potentially compromised and fully refreshed.

RPT-2026-0323
MedicalOPERATION TOPAZ19 Mar 2026

Uneven flooring in B1 service corridor at Claridge's caused a team member ankle injury. Venue hazard logged. Written confirmation of hotel remediation required. This entry should be checked before future engagements at this location.

RPT-2026-0319-B
6 of 6 lessons